Public Notices

Clarification on IFP No. 03/NTA/2074/075 Invitation for Application to Build Broadband Network and Provide Internet Access Connectivity Services in Singhdarbar Area, Padmakanya Multiple Campus Area and Sanchargram

Request for Application

NEPAL TELECOMMUNICATIONS AUTHORITY (NTA)

Kamaladi, Kathmandu, Nepal

 Invitation for Application to Build Broadband Network and Provide Internet Access Connectivity Services in Singhdarbar Area, Padmakanya Multiple Campus Area and Sanchargram

First Date of Publication: 20 August, 2017

Clarification on IFP No. 03/NTA/2074/075

 

Query

Comments/Reply

Outdoor AP installation may require additional pole or tower. So, in the location where these are not available or feasible for installation, in such case the cost of installing the same for AP mounting is not included or specified in this document.

SLO has to install AP in existing pole or wall.

Once the project is completed by the due date, during the operational phase we wish to know about the safekeeping of the devices and equipments installed in the project area as they may be at a risk of being vandalized, damaged due to short circuit, High Voltage and physical harm or damage. In such cases, we wish to know who is responsible for replacement of these equipments?

According to GCC clause no. 3.4 Insurance to be Taken Out for 5 years by the SLO for the Equipments.